Table 2.—Timing Accuracy of Real GDP Estimates at Cyclical Peaks and Troughs

Estimate Peaks
1969:III 1973:IV 1980:I 1981:I 1990:II
Advancexxxxy
Preliminaryxxxxy
Final(/1/)(/1/)xxy
First annualx(/1/)(/1/)(/1/)y
Second annualxxxyx
Third annualxxxxx
Troughs
1970:IV 1975:I 1980:III 1982:III 1991:I
Advancexyyyx
Preliminaryxxyyx
Final(/1/)(/1/)yyx
First annualxx(/1/)yx
Second annualxxyxx
Third annualxxy(/1/)x

1. Estimate was not made.

x Peak or trough correctly identified

y Peak or trough not correctly identified

DCSIMG